Complete bathroom renovation in Dubai

Bathroom: walnut vanity, glass shower, dark porcelain stoneware

A bathroom from scratch: we strip it back, replace the pipework, waterproof and flood-test, tile to a planned layout and install the fixtures. No leaks to the neighbours, no crooked joints.

What is included

Waterproofing test: the bathroom floor flooded for 24 hours
  1. Strip-out to the base
  2. Water and drainage pipework, pressure-tested
  3. Screed with falls to the drain
  4. Floor and wet-area waterproofing, flood-tested
  5. Tiles and porcelain to a planned layout
  6. Walk-in showers, drains, glass screens
  7. Concealed cisterns and wall-hung fixtures
  8. Ventilation and lighting
  9. Mirrors, vanity units, accessories

What we test in a bathroom

  • Pressure-tested pipes

    The system stays under pressure before the walls are closed.

  • Flood-tested waterproofing

    We flood the floor and wait a day before tiling.

  • Falls to the drain

    Water goes down the drain, not to the doorway.

  • Tile layout

    Joints and cuts are planned before tiling starts.

Questions

FAQ

How long does a bathroom renovation take?

Usually a few weeks: most of the time goes on layers that must cure — screed and waterproofing. The exact timeline is in the contract.

Do I need approval?

Replacing pipes and fixtures usually needs approval from building management. We handle it.

Can I have a walk-in shower without a tray?

Yes, if the floor height allows: we build falls and fit a point or linear drain.

Enquiry

Tell us about your home — we will price the renovation

Describe the job — we will get in touch, clarify the details and arrange a survey.

What do you need

We will contact you at the number you leave.

Message us on Telegram