Complete bathroom renovation in Dubai
A bathroom from scratch: we strip it back, replace the pipework, waterproof and flood-test, tile to a planned layout and install the fixtures. No leaks to the neighbours, no crooked joints.
What is included

- Strip-out to the base
- Water and drainage pipework, pressure-tested
- Screed with falls to the drain
- Floor and wet-area waterproofing, flood-tested
- Tiles and porcelain to a planned layout
- Walk-in showers, drains, glass screens
- Concealed cisterns and wall-hung fixtures
- Ventilation and lighting
- Mirrors, vanity units, accessories
What we test in a bathroom
Pressure-tested pipes
The system stays under pressure before the walls are closed.
Flood-tested waterproofing
We flood the floor and wait a day before tiling.
Falls to the drain
Water goes down the drain, not to the doorway.
Tile layout
Joints and cuts are planned before tiling starts.
FAQ
How long does a bathroom renovation take?
Usually a few weeks: most of the time goes on layers that must cure — screed and waterproofing. The exact timeline is in the contract.
Do I need approval?
Replacing pipes and fixtures usually needs approval from building management. We handle it.
Can I have a walk-in shower without a tray?
Yes, if the floor height allows: we build falls and fit a point or linear drain.
Tell us about your home — we will price the renovation
Describe the job — we will get in touch, clarify the details and arrange a survey.